logosm.gif (10613 bytes)

WATER TREATMENT PLANT

Semper Water Treatment Plant

Westminster, Colorado

Description of Work:

This project includes expansion and modifications to the existing City of Westminster Water Treatment Plant. The improvements will increase plant treated water capacity from 33 MGD to 44 MGD. Scope of work includes the addition of a new sedimentation basin, a new Bulk Chemical Building, a Lime Storage Silo, a new High Service Pump Station Building, a new clear well and modification to the existing sedimentation basins. Electrical work, instrumentation, and HVAC improvements are included.

Name and Address of Owner:

Judy Ding
City of Westminster
(303) 430-2400

Contract Number and Type:

 

Period of Performance:

Project Duration: 821 days
Finish Date: August 1997

References:

Chuck Raske
Centric-Jones Construction

9655 So. Meridian Blvd.
(303) 233-8440

Kevin Meador
HDR Engineering, Inc.

303 E. 17th
Denver, CO 80202
(303) 764-1520

Percentage of Work by Ludvik Electric Co.’s Own forces: 100%