Great West Life Office Tower III
Greenwood Village, Co
Owner: Great West Life Properties
Mr. Ken Austin
(303) 779-3380
General Contractor: PCL Construction Services
Mr. Dale Kain
(303) 365-6519
Architect: Anderson Mason Dale, P.C.
Mr. Curt Dale
(303) 294-9448
Engineer: Gordon, Gumeson & Associates
Mr. Tom Barwinski
(303) 779-1222
Completion Date: January 2000
The Great West Life & Annuity Insurance Company is located in the Denver Tech Center at Orchard and I-25. The new Tower III will be constructed adjacent to the existing Towers I & II and will duplicate its construction.
Tower III will be a ten-story building comprising of 272,000 square feet of office space with a mechanical penthouse and one level below grade that will include a large area for conferences and/or conventions.
The electrical service to Tower III will be 6500 amps and primarily distributed throughout the building by means of Bus Duct with critical loads being protected by a 750 kw generator located in the lower level of the Tower. Fire protection to the building will include an Intelligent Addressable Fire Detection and Alarm System.
Ludvik Electric participated in a design- assist program with Gordon, Gumeson & Associates and PCL Construction Services in the design of the electrical system in an effort to offer the best system at the lowest price. A GMP contract will be with PCL.