The project consisted of the design and layout of a parcel UPS Parcel Distribution
Denver, CO

handling system for a 1,200,000sq. ft. facility.
The design-build conveyer system is capable
of handling 570,000 packages a day.
View Ludvik’s Design-Build Projects
General Contractor: Ludvik Electric Co.