The design-build project consisted of relocating the Titan Centaur Final Assembly Plant from the Martin Marietta Plant in San Diego to Littleton, Colorado. The Cleanroom was an addition of 41,400sq. ft. associated with a 150,000sq. ft. warehouse remodel to accommodate the testing areas, storage areas and the operations support area. A 14,300sq. ft. office addition and a 10,000sq. ft. mechanical support addition were part of this project. Two 10-ton and one 15-ton overhead cranes were added for missile transportation and assembly. Reverberation Acoustical Lab Testing Facility: This project consisted of remodeling the existing acoustical and thermal lab to meet the Titan Missile requirements. General Contractor: Swinerton & Walberg Co. View Ludvik Electric's Design Build ProjectsMartin-Marietta
Titan Centaur Assembly Cleanroon & Reverberation Acoustical Testing Lab
Littleton, CO