The upgrades to the CF&I Steel Plant included both a Vacuum Tank Degasser/Ladle Refining Furnace and a Rail Bloom Reheat Furnace Facility. The fast track industrial installation included: General Contractor: ICM/EBY, A Joint Venture CF&I Steel Rail Bloom Reheat Furnace Facility
Pueblo, CO
CF&I Steel Rail Bloom Reheat Furnace Facility
• Re-feeding existing substations
• Addition of 2 substations
• Power correction factor capacitors
• Motor Control Centers
• Calibration, installation, wiring and testing devices
• Re-circulation water pumps
• Water filtering and lubrications systems
• Gaitronics Communication System
• Aircraft Warning Stack Lights
AGC of Colorado awarded Ludvik Electric Co. A 1995 ACE Award for this project